Products
- Shopping Bags[19]
- Brick Making Machinery[32]
- Paper Processing Machinery[26]
- Paper Product Making Machinery[53]
- Sand Making Machinery[1]
- Wet Wipe Making Machinery[2]
- Other Machinery[3]
- Mazut[1]
- Waste Management[15]
- Forklifts[4]
- Nonwoven Fabric[4]
- Diapers/Nappies[10]
- Sanitary Napkin[5]
- Paper & Paperboard[1]
- Panty Liner[2]
- Serving Trays[4]
- Polymer[2]
Contact Us
- Contact Person : Ms. Young Sophia
- Company Name : Quanzhou Licheng Import and Export Co., Ltd.
- Tel : 86-595-28851333
- Fax : 86-595-22518000
- Address : Fujian,Quanzhou,Unit 411-414, Sea Harmony Bldg, Yunlu Road
- Country/Region : China
- Zip : 362000
paper machine
Product Detailed
Related Categories:Paper Processing Machinery
Detailed Product Description
787mm (0.8-1.0TPD) Toilet paper machine 1. Output paper: Toilet paper
2. Raw material: protoplasm, book, newspaper, straw, wheat straw, bamboo
3. Paper width: 787mm
4. Speed: 10-60-80 meters/min
5. Output weight: 20-80-180g/m2
6. Capacity: 0.8-1.0Tons/Day(24hours)
7. Cylinder Specifications:φ 700mm×1100mm
8. Drier: φ1000mm×1100mm
9. Gauge: 850mm1300mm
10. Transmission style: reduction machine transmission.
11. Dimension(meter): 4.1 x 1.5 x 2.2 (length*width * height)Other required datas :Manpower :4men/shift(8hours)
Area required: 400m2I. Lead time : With 60 -90 days
II.Term of payment : 40%T/T in advance ,60% T/T before shipment .
III. Shipment : It will be arranged by the seller , the seller will offer sea freight to the buyer two weeks before shipment and the buyer must pay the sea freight to seller by T/T within 3 days after receive such offer on condition they accept it. The seller need to pack all machines well.IV. Installation &after sales service .
a) The seller will send 3 engineers to go to the buyer's plant to guide installation work of all supplied machines by the seller. They will also guide test run of the whole plant and sign test run and acceptance agreement after successful test run.
b) Condition for installation: The buyer need to complete all following conditions to start installation:
* Boiler installed and in normal working condition;
* Electric Power supply and distributing work are OK;
* Plumbing engineering work is OK;
* Prepare all materials necessary for installation listed by sellers engineers:
C) One year warranty for equipment , spare parts supply for long-term;We will offer lifetime consultation service.
Related expenses should be paid by you :