Quanzhou Licheng Import and Export Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Young Sophia
  • Company Name : Quanzhou Licheng Import and Export Co., Ltd.
  • Tel : 86-595-28851333
  • Fax : 86-595-22518000
  • Address : Fujian,Quanzhou,Unit 411-414, Sea Harmony Bldg, Yunlu Road
  • Country/Region : China
  • Zip : 362000

Paper making machine ,Paper processing machine ,Waste paper recycling machine

Paper making machine ,Paper processing machine ,Waste paper recycling machine
Product Detailed
Related Categories:Paper Processing Machinery

Detailed Product Description


We may supply Paper making machine ,Paper processing machine ,Waste paper recycling machine .

1575mm(3TPD) Toilet paper machine.

1. Output paper: Toilet paper3. Output weight: 1330g/m2
4. Paper width: 1575mm
5. Net-cage width: 1950mm
6. Capacity: 3T/Day
7. The gauge: 2400mm
8. Drives: use frequency conversion, and drives by step.
9. Way of hanging plup: inverse hang the pulp
10. Compression: air-operated compression.
11. Design for the machine: square chest style, have the left and right hand machine.
12.Manpower :6-10men/shift(8hours)
13.Area required:1200-1500m2I. Lead time : With 60-90 days
 
II.Term of payment : 40%T/T  in advance  ,60% T/T before shipment .
III.    Shipment : It will be arranged by the seller , the seller will offer sea freight to the buyer two weeks before shipment and the buyer must pay the sea freight to seller by T/T within 3 days after receive such offer on condition they accept it. The seller need to pack all machines well.IV. Installation &after sales service .

 a)   The seller will send 3 engineers to go to the buyer's plant to guide installation work of all supplied machines by the seller. They will also guide test run of the whole plant and sign test run and acceptance agreement after successful test run.

b) Condition for installation: The buyer need to complete all following conditions to start installation:

  * Boiler installed and in normal working condition;

      * Electric Power supply and distributing work are OK;

      * Plumbing engineering work is OK;

      * Prepare all materials necessary for installation listed by sellers engineers:

C)  One year warranty for equipment , spare parts supply for long-term;We will offer lifetime consultation service.

Related expenses should be paid by you :



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.